SUBSOIL
(9" on Greens + 12" on Tees)
REQUIRED
3, 100 Cu. Yards. Obtained from building sites Road widenings. excavations
etc
TOPSOIL
(4" on Greens + 3" on Tees)
REQUIRED
1310 Cu.Yards. Obtained from area of proposed roadway. (400 yards
long x 3 yards wide to 3" deep yields 100 cu yards)
Topsoil from site of proposed greens (14 suitable) to 2" deep yields
467 cu yards. Topsoil from further selected 3 acres to 2" yields 810
cu. yards.
TOTAL = 1377 cu. yards